Modules 07, 08 and 09 at Múltiplo Tocantins, in Alphaville Industrial, with the dock next to 09 open and the yellow awning over the offices

Múltiplo 3 · Barueri/SP region

Múltiplo 3

Ten compact warehouses, combinable as the operation grows.

In operationMature occupancy

01

Fact sheet

Ten warehouses.
Module of 812 m².

The smallest module in the group. And the one that closes fastest. Companies that come to Múltiplo 3 usually arrive growing: they take what they need today and already look at the module next door.

It is built for last mile, transshipment and forward stock. You start with one module. If demand calls for it, you reach the whole set.

Specifications

  • Warehouses 10
  • Module 812 m²
  • Built area 8,120 m² (2025 appraisal report)
  • Docks one per module, with underground parking
  • Management gatehouse, maintenance and contract answer to the same desk
  • Status in operation, mature occupancy

The full fact sheet comes with the leasing team's reply.

10 Warehouses in the park
812m² Standard module area
8,120m² Maximum set, with all ten combined

Areas according to the 2025 appraisal report: ten modules, 8,120 m² built, in Alphaville Industrial, Barueri/SP. Combining the ten modules into a single set is being confirmed with the group.

Internal road of Múltiplo Tocantins seen from the entrance, with the row of modules on the left and the neighbor's wall on the right
02

Combining

Start small.
Grow without moving.

The ten warehouses share walls. As the operation grows, the module next door joins the same contract: no change of address, no renegotiating infrastructure, no stopping the operation.

Combining depends on the availability of the neighboring modules.

812 m² 8,120 m²
Row of modules at Múltiplo Tocantins in perspective, from module 10 in the foreground to the end of the axis, with an open dock and the interlocking-paver yard
04

Site plan

Ten modules
on the same grid.

The site plan repeats the same drawing ten times: one module, one frontage, one stretch of yard. It is this repetition that allows combining two, three or all ten with no adaptation work.

As in the other parks, the group that built it is the group that manages it. Decisions cross the owner's desk, and the phone number stays the same after signing.

Schedule a visit
05

Availability

Mature occupancy,
modules in rotation.

Múltiplo 3 runs at mature occupancy. If you need compact area with room to grow, talk to the leasing team.

Tell us the area, the term and the type of cargo. Leasing replies with what is still available. Terms and availability on request.

Central axis of Múltiplo Tamboré, with the yellow-clad warehouses on both sides

Another unit

Múltiplo 1

Twenty warehouses. The park that started the Múltiplo logic.

See Múltiplo 1
Steel warehouse frame being assembled on the construction site

Another unit

Múltiplo 4

Thirteen warehouses under construction now. Delivery scheduled for December 2026.

Follow the construction